Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

October 2, 2023

January 31, 2024

86032 Co Hwy 61

Renovation

No Information to Display

$133,666.00

Public - State/Provincial

img_map_placeholder

86032 Co Hwy 61, Willow River, MN

Subscribe to View Full Documents

Site Directions: 86032 Co Hwy 61, Willow River, MN 55795 Question Deadline 08/29/2023 at 2:00 PM CT All questions should be submitted, The State is not obligated to answer questions submitted after the question due date and time. Est. Completion Date: Jan. 31, 2024 State Project Number 78WR0016 Barracks Boiler Replacement at MCF Willow River A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Replacement of two fully condensing natural gas fired hydronic boilers and their associated boiler pumps. 2. Replacement of two variable volume base mounted hydronic circulating pumps and their associated adjustable speed drives. 3. Replacement of 6 existing dielectric unions on hydronic piping. 4. The addition of a new hydronic filter/feeder to the existing system. 5. Electrical and building automation system modifications necessary to operate and control the new equipment. Plans and Specifications were prepared by Ericksen Ellison and Associates Inc., Matt Armstead, 305 2nd Street NW, Suite 105, New Brighton, MN 55112, 651-632-2313, marmstead@eeaengineers.com This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor or as a Subcontractor, the work for at least two (2) contracts which have achieved Substantial Completion since August 1, 2018, for construction of hydronic boiler replacements. Each of these contracts MUST have had a construction value of $60,000 or greater. Project Manager and Job Superintendent responsible for this project EACH has had at least five (5) years of experience with hydronic boiler replacements similar in scope and value to this project. All visitors are required to complete and return BCA consent forms by the time and date noted. Visitors will not be admitted without an approved security clearance. Attendees will meet at the main building as shown on the bid documents. Cellphones, tablets, cameras, smart watches, and laptops will not be allowed into the facility.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.