Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 4, 2023

No Information to Display

To Be Determined

New Construction, Site Work

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Houston, DE

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This Request for Proposal (RFP) issued by the Delaware Department of Transportation (DelDOT) is for the purpose of acquiring Proposals from qualified firms to deploy, operate and maintain electric vehicle (EV) charging stations in affiliation with the U.S. Department of Transportation’s (DOT) Federal Highway Administration (FHWA) National Electric Vehicle Infrastructure (NEVI) Program. This request for proposals (RFP) is issued pursuant to 29 Del. C. §§ 6981 and 6982. All selected firms shall be expected to procure all necessary professional services, construction and/or project management to fulfill the grant requirements for the installation of public direct-current (DC) fast charging stations in Delaware that satisfy the established NEVI requirements. Each bidder must furnish a Bid Bond to the State of Delaware for the benefit of the Delaware Department of Transportation in the amount equal to 10% of the respective bid value. The bond shall be drawn upon an insurance or bonding company authorized to do business in the State of Delaware. If the enclosed standard State of Delaware bond form is not used, the substitute bond must reflect the minimum conditions specified in the standard form. A certified or bank check made out to the Delaware Department of Transportation in an amount equal to 10% of the respective proposed value may be submitted in lieu of a proposal bond. The deposits shall be returned to the successful bidder upon the execution of the formal contract. The deposits of unsuccessful bidders shall be returned to them immediately upon the awarding of the contract or rejection of their bids. Bidders are made aware that Certified or Bank Checks submitted in lieu of Bond will be deposited, and unsuccessful bidders will receive payment of the value of the check from the state. Contractors awarded contracts are required to furnish a Performance Bond to the State of Delaware for the benefit of the Delaware Department of Transportation with surety in the amount of 100% of the specific award. Said bonds shall be conditioned upon the faithful performance of the contract. This guarantee shallbe submitted using a form supplied by DelDOT in the form of a good and sufficient bond drawn upon an Insurance or Bonding Company authorized to do business in the State of Delaware. DEDOT - RFP Engineering - National Electric Vehicle Infrastructure Question Deadline 10/05/2023 at 3:00 PM ET Contract Award Within 90 days of bid opening

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.