Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 5, 2023

January 4, 2024

May 28, 2024

To Be Determined

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

To Be Determined, Sebring, FL

Subscribe to View Full Documents

**As of December 05, 2023, the project is on hold. No definite date for the rebid.** This project will repair the stormwater drainage system that serve the central portion of the airfield and the associated runways, taxiways, and apron. The project includes demolition and replacement of the existing stormwater system and associated infrastructure as depicted in the Contract Documents. Guarantee will be required with each bid as a certified check on a solvent bank or a bid bond in the amount of five (5) percent of the total amount of the bid, made payable to the Sebring Airport Authority. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.