Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

October 31, 2023

State Rte 55

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

State Rte 55, Hastings, MN

Subscribe to View Full Documents

HWY 55 Bituminous Walk Reconstruction Project The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 24,000 S F Remove Bituminous Walk 20 L F Remove and Replace Concrete Curb and Gutter 1,000 S F 4" - 6" Concrete Walk 29,000 S F 3" Bituminous Walk 200 TON Bituminous Patching (Roadway for Ped Ramp Replacement) 1 ACRE Boulevard Restoration The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Hastings shall comply with the provisions of the statute.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.