Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

September 20, 2023

No Information to Display

3 Randolph St

Renovation

No Information to Display

$315,500.00

Public - State/Provincial

img_map_placeholder

3 Randolph St, Canton, MA

Subscribe to View Full Documents

As of October 18, 2023, this project has not yet been awarded. A timeline for award has not yet been established. DPH2050: Pappas Rehabilitation Hospital for Children Dehumidification System Replacement at Pappas Rehabilitation Hospital for Children: 3 Randolph Street, Canton, MA 02021. Filed sub-bid questions are due on August 30,2023, at 5:00pm. Scope of Work. The Work comprises the completed construction required by the Contract Documents and includes all labor, tools, materials, supplies, equipment, permits, approvals, paperwork, calculations, submittals, and certificates necessary to develop, construct and complete the Work in accordance with all Laws, and all construction and other services required to be supervised, overseen, performed or furnished by Contractor or that the Contract Documents require the Contractor to cause to be supervised, overseen, performed or furnished. The Contractor shall provide and perform for the Contract Price all of the duties and obligations set forth in the Contract Documents. 3. Interpretation. A. The Drawings and Specifications and other Contract Documents are to be considered together and are intended to be mutually complementary, so that any work shown on the Drawings though not specified in the Specifications, and any work specified in the Specifications though not shown on the Drawings, is to be executed by the Contractor as a part of this Contract. Should a conflict occur in or between or among any parts of the Contract Documents that are entitled to equal preference, the better quality or greater quantity shall govern, unless the Awarding Bid Results :: Roofing and Flashing :: Rockwell Roofing Inc., $164,000.00 ELECTRICAL WORK :: Richard T. Losordo Electrcial Services Inc., :: $151,500.00

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.