Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 5, 2024

May 6, 2024

No Information to Display

400 E Tyler Mall

Renovation

No Information to Display

$9,500,000.00

Public - State/Provincial

img_map_placeholder

400 E Tyler Mall, Tempe, AZ

Our team is requesting plans for this project.

Subscribe to View Full Documents

Arizona State University (ASU) extends an invitation to interested and qualified firms or individuals to submit a statement of qualifications to provide services as Construction Manager at Risk in support of the restoration to the exterior of Old Main located on the Tempe campus. The successful CMAR in this selection will be able to provide services at ASU’s discretion for renovation/ modification projects, related to this project as described below, for the duration of the warranty period of two years after substantial completion. Clean the exterior brick and stone. ii. Repair and repoint the existing brick masonry and stone mortar. iii. Remove and replace non-matching, damaged mortar joints that were repointed from previous repair work. iv. Seal the brick and stone. v. Replace existing windows and doors with new insulated glazing to closely match original style/ finish. vi. Repair to interior window and door jamb/head/sill wall surfaces. vii. Patch and repair existing metal roof. viii. Remove landscaping placed up against building that may be causing water damage. ix. Regrade surfaces adjacent to the building to divert rain water away from the building and to prevent the accumulation of rain water. x. Additional scope such as utility and infrastructure improvements as determined during the design phase. ASU reserves the right to cancel all agreements at their discretion.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.