Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 28, 2023

No Information to Display

160 Passaic Ave

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

160 Passaic Ave, Lockport, NY

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Work of Project is defined by the Contract Documents and consists of the following: 1. The work of this agreement shall include, but not limited to, all labor, materials, tools, equipment, plant, supplies, shop drawings, layout, transportation, supervision, contributions, insurance compliance with all agencies (Town, County, State and federal as may be required), and shall cover all other items necessary for the performance of the Awarded Contracts as shown detailed and/or implied by the following documents and as defined herein. This requisition is intended to supplement the Contract Specifications and drawings and must be used in coordination with these documents to fully understand the Scope of Work. Requirements given in one area thus are applicable to all. This requisition does not generally repeat scope requirements given in the Contract Documents, but clarifies and coordinates the work. Project Location: Aaron Mossell (North Park) Junior High School 160 Passaic Avenue Lockport, NY 14094 Bid bond payable to the owner shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Owner reserves the right to accept or reject any and all bids, to re-advertise for new bids and to waive informalities and irregularities in connection with any bid. All potential bidders must self-perform a minimum of 20% of the work. The Contractor shall provide 20% on site construction or supervision as proof of self-performance associated with the contract that they submit bids for (not including general overhead - i.e. submittals, RFI and RFP paperwork, construction meetings, etc.)

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.