Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 6, 2023

No Information to Display

850 E Colton Ave

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

850 E Colton Ave, Redlands, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

A California type C -27 license or equivalent is required to be held by contractor. Contractor must have current registration with CA Department of Industrial Relations. The District is seeking DVBE participation with this bid. The Board of Trustees of the Redlands Unified School District reserves the right to accept or reject any and all bids. Create a safe and stimulating Outdoor Learning Area in the kinder area. Area grounds will be transformed from dirt and un-landscaped with hazardous trees to an area comprised of artificial turf with enough room for multiple learning activities, concrete pads for seating and tables, and purpose planted shade trees with proper irrigation. The asphalt will be removed and replaced with new asphalt or concrete and ready for instructional activities to be painted by the School District Paint department or the site provided painters. Tree removal: 5 ash and 1 oak problematic trees , stumps and roots will be removed. Artificial turf areas to be graded for depth and runoff with 3 inches of compacted class II road base and 1 inch of decomposed granite installed. Large and medium sized sitting rocks (approximately 15-20) arranged in classroom room type settings in artificial turf areas Artificial turf spec: Polyethylene - C blade, 60 Oz., 2.0 inch Turfone Fescue with sand infill Asphalt area to be removed, all tree roots removed, graded for proper run off fall and replaced with 4" thick 3000 psi mix concrete doweled in to existing concrete with a broom finish. Tree planting: 3 Hybrid AZH Mesquite large box trees planted and deep watering irrigation system install to trees. Demo asphalt, grade for proper run off fall, form and pour two 3000 psi mix concrete pads 4 inches thick. Pad #1 - 315 Sq Ft, pad #2 - 270 Sq Ft with a broom finish. Form and pour two foot wide 3000 psi concrete V ditch for water drainage - 90 Sq Ft Clean and grade next to west side of portable classroom for proper run off fall

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.