Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 18, 2023

October 31, 2023

200, 1118 North Railway St

Renovation

No Information to Display

$150,000.00

Public - State/Provincial

img_map_placeholder

200, 1118 North Railway St, Okotoks, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Everest Construction Management Ltd. is seeking proposals from qualified and experienced Millwrights and Process Mechanical Contractors for the provision of construction services including supply of labour and materials to complete refurbishments to a number of items within the existing CTU1 (Combined Treatment Unit 1) wastewater processing vessel. CTU1 consists of a separate bioreactor and clarifier. Bioreactor aeration system replacement Replace membrane discs (supplied by Owner) (lump sum) Inspection/condition assessment of PVC aeration piping and floor supports/anchors, and replace as necessary (cash allowance) Testing and commissioning of aeration system WAS pump discharge connection replacement Secondary clarifier mechanism repairs and re-coating as required, based on the condition assessment performed jointly between the Contractor, Engineer and Owner (cash allowance) Alum piping re-routing Bioreactor baffle wall flap gates Optional work: Pipe supports replacement WAS pumps guiderail and guide bar replacement General requirements including but not limited to: All required testing and commissioning of the new equipment. Schedule and coordinate all work with Town Operations. Provide and implement a project-specific health and safety plan. Provide and implement a project-specific quality control plan. Provide all required temporary construction facilities, utilities, and equipment. Be responsible for all waste management and disposal. Provide all required shop drawing submittals for review by the Consultant. Documents can be obtained from https://bids.bidsandtenders.ca/ Cancelled - Plans to re-tender has not been determined.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.