Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
March 1, 2024
No Information to Display
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - City
Multiple Locations, Seattle, WA
Plans and Specifications are not available for this project. If that changes, they will be made available here.
The Consultant shall perform the Services on an as-needed-basis. The Consultant understands that this is an as-needed Contract with no specific scope of work or payment authorized and that there is no guarantee for any specific amount of work to be assigned under this Contract. Actual work shall be assigned by separately executed Work Orders (see Exhibit A for a sample Work Order document). The Consultant shall provide timely response to completing the work assigned in Work Orders. Consultant shall perform its duties under this Contract with the care, skill, prudence, and diligence that a reasonable, professional consultant would exercise in similar circumstances. Work Order Placement. When work is required under this Contract, SHA will contact the Consultant. The Consultant will be provided information regarding the services required and will be given an opportunity to ask questions. SHA and the Consultant shall negotiate the cost and scope of work. A Work Order will be prepared describing the Service required, the cost, schedule, and the work products to be delivered. The Work Order shall be signed by both parties. SHA may desire to have the Consultant render services in connection to a Work Order in addition to the items specified in the Scope of Work of that Work Order. Such services shall be considered extra work and will be specified in a Change Order to the Work Order, which shall set forth the nature and scope of the additional work as well as the level, maximum amount, and methods of compensation to the Consultant for the additional work to be performed. Such additional services shall not be performed or initiated until a Change Order authorizing such work is executed by both parties. SHA does not guarantee that work orders will be issued on a regular basis or that the value of all issued work orders will total a specific contract value. More than one firm may be selected, and SHA has the right to determine how to distribute the work. Services will be provided in connection with properties located within the City of Seattle. Properties may or may not be owned by SHA. Properties may or may not be vacant, and non-vacant properties may or may not be occupied at the time the services are rendered. The consultant may be required to perform some or all of the following: Forensic investigations and reports Review of site surveys, geotechnical reports, preliminary studies, engineering reports, plans, and/or and title reports Preliminary site reconnaissance and reporting including evaluation of off-site utilities relevant to the site and analysis of capacity. Analysis, design, permit submission, and construction documents for the following: infrastructure master planning jurisdiction as-built research including possible public records request site demolition and phasing temporary erosion and sedimentation control temporary and permanent dewatering and stormwater management site grading and drainage roadways, sidewalks and other off-site improvements utility systems and services site retaining structures street and site lighting landscape design Preparation and submittal of Street Improvements Plans Preparation and submittal of Utility Major and Minor Plans Coordination with City utilities, franchise utilities, and other City departments Preparation of Design Review documents related to the consultant's work Development of project cost estimates Assist in preparation of bid documents for contractor selection Construction monitoring and administration of the construction contract All other services normally provided by Civil Engineers for which licensure by the State of Washington as a professional engineer is required or normally provided. Services related to any of the foregoing may require the use of other design professionals, whether subconsultants or not, including but not limited to land surveyors, Architects, landscape architects, arborists, structural engineers, MEP engineers, transportation engineers, construction managers, and cost estimators. Any addenda issued for this RFQ will be published at the above-referenced website and submitters are responsible for checking the website prior to submission of Submittals for any addenda. If you are unable to download the RFQ or addenda, you may e-mail the Sr. Contract Administrator at purchasing@seattlehousing.org. Questions: Any questions or requests for further information must be submitted in writing no later than 4:00p.m., on Monday, August 21, 2023, to the Contract Administrator noted above by e-mail at purchasing@seattlehousing.org, or by mail at the address below. Diversity: SHA strongly encourages minority-owned and women-owned businesses, socially and economically disadvantaged businesses, HUD Section 3 businesses, and small businesses to submit or to participate in a subcontracting capacity on SHA contracts. Rights Reserved: SHA reserves the right to waive as an informality any irregularities in submittals, and/or to reject any and all submittals. The method of Contractor Selection has not been Determined at this time.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Aug 14 2023
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Aug 24 2023
Seattle, WA
Bid Date: Aug 31 2023
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Aug 18 2023
Seattle, WA
Bid Date: Mar 31 2023
Seattle, WA
Bid Date: Aug 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
