Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 21, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

Multiple Locations, Beverly Hills, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000327204 The Road Commission for Oakland County is requesting proposals for Storm Sewer Repairs in Coulter Lake Estates, to include all labor, equipment and materials (except pipe) needed to complete the repairs as specified. Lump-sum proposal pricing. All communication and inquiries concerning this proposal shall be made in writing to the purchasing agent. Deadline for all written communication shall be end of business day on Tuesday, August 15, 2023. Any response will be in the form of an on-line addendum which shall be acknowledged by prospective bidders. Purchasing Agent: Tracy McDonald 248-858-4796 purchasing@rcoc.org Award Requirements - All or None Award Question Acceptance Deadline 08/15/2023 12:00 AM EDT Questions are submitted online No Intent & Scope of Work RCOC is seeking a written proposal for this scope of work, material unit costs and total price, for the labor, materials, and equipment required for Storm Sewer Repairs in Coulter Lake Estates as specified in the attached drawings and specifications. The project consists of the following specifications: o Excavate down to separated concrete pipe o Lift existing 12-inch concrete pipe back into place and place collar around it. o If existing pipe is not salvageable then a 12-inch CMP will be supplied to install. o Restore existing area o Contractor is responsible for any new materials except for pipe (contractor can reuse existing material for backfill) o See attached plan sheet (highlighted area of work) and snap shot of separated pipe.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects