Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 22, 2023

No Information to Display

8702 91 Ave

Addition, New Construction, Site Work

No Information to Display

$620,000.00

Public - State/Provincial

img_map_placeholder

8702 91 Ave, Lac La Biche, AB

Subscribe to View Full Documents

Reference Number 0000253811 Bid Intent Deadline 2023/08/14 12:00:00 AM MDT Subcontractor to assume responsibility for all labour, materials for specific scope of work All quotations shall be valid for the duration of the Bid Validity period as noted in the Bid Documents Lowest tender not necessarily accepted Successful bidders will be required to sign EllisDons Standard Form of Subcontractor Agreement All Bidders must apply and meet EllisDons Subguard criteria on all contracts over $250,000. EllisDon is using Subcontractor Default Insurance (SDI) on this Project. This is an insurance product that replaces Subcontractor bonding. As SDI is being used on this Project; the bidder will not be required to provide a performance and payment bond, provided that the Subcontractor has successfully pre-qualified to EllisDon for enrollment into the insurance program. All Subcontracts with a subcontract value in excess of $250,000 must have Contract Performance Security in the form of an acceptance and rating from EllisDon. The rating from EllisDon must be equal to, or in excess of the subcontract amount, or the subcontractor will be required to supplement the security with alternate forms of security acceptable to EllisDon, at the Subcontractors expense. The cost of Subcontractor Default Insurance for accepted Subcontractors is covered by EllisDon. All other costs of security are at the Subcontractors expense. The EllisDon Subcontractor Default Insurance PreQualification Application will be sent to you by us electronically. The form is filled out on-line. Please contact EllisDon with the name and e-mail address of the person at your company who will be responsible for filling out this application form. View our Subcontractor's Bill of Rights at www.ellisdon.com Subcontracts over $100,000 are required to use EllisDons SUBcentre project management system; All contractors will be subject to a non-negotiable Gate Three fee.: For contracts between $100,000 - $1,000,000, the rate is $99.00/month; For contracts greater than $1,000,000, the rate is $1,200/year for the duration the contract until all payments been released. Please send bids and questions to Edmonton Estimating at: edmontonestimating@ellisdon.com Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects