Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

September 11, 2023

December 10, 2023

Multiple Locations

Site Work

No Information to Display

$429,878.00

Public - City

img_map_placeholder

Multiple Locations, Chevy Chase, MD

Subscribe to View Full Documents

As of September 20,2023, this project has not yet been awarded. A timeline for award has not yet been established. Installation of a municipal storm drain in the rear yards of several private properties to connect to a Montgomery County storm drain. The Resketch Drainage Improvement Project consists of the installation of a new closed storm drain system within the Cedar Parkway right-of-way (ROW) and 8 privately-owned contiguous parcels along West Irving Street. The project will address poor drainage conditions along the rear property lines of the privately-owned parcels. The project will replace a portion of the County maintained storm drain system on Cedar Parkway, including two curb opening inlets. WSSC, Washington Gas, and PEPCO utilities will need to be relocated or protected during the storm drain installation. This project includes 0.25 acres of disturbances associated with new RCP and HDPE storm drain pipe, new inlets, new manholes and three access points for construction. The Contractor will be responsible for the site clearing, tree removal or protection, storm drain construction, water main relocation, coordination with Washington Gas to protect their utility, erosion and sediment control and site stabilization with turf grass establishment. Access is provided from 3 separate residential driveways; 5815 Cedar Parkway, 30 W. Irving Street and 21 Resketch Street. Trimming of trees and shrubs may be required along the access routes. Following review of written bids submitted to the Village, some or all of the bidders may be requested to appear before the Village Manager and/or his/her staff to discuss its bid and answer any questions the Village may have with respect to the bid or the bidder's qualifications for this project. Question Deadline 08/22/2023 at 2:00 PM ET Any questions regarding this Invitation for Bids shall be made in writing to the attention of Ellen Sands, Project Manager, Chevy Chase Village Hall. Ms. Sands may be contacted via email at ellen.sands@montgomerycountymd.gov.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.