Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 21, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$3,066,800.00

Public - City

img_map_placeholder

Multiple Locations, Stockton, IL

Subscribe to View Full Documents

The Village of Stockton is accepting Statements of Qualifications from consultants for Engineering services (PE2 & PE3) for its Downtown Sidewalk Improvement Project. The Village of Stockton was awarded an ITEP grant, with grant funds being allocated for construction engineering/observation services and for construction of the overall sidewalk project. The Downtown Sidewalk Improvement Project is located in the Village's Downtown District. The project will include improvements on Main St/Route 78 and Front Avenue. The scope of construction entails a complete removal and reconstruction of the sidewalk network, bump outs, decorative lighting, curb and gutter, storm sewer, pavement patching, and related work. The evaluation criteria and weighting for this project is as follows: IDOT Familiarity - 25%, Qualified Engineer - 25%, Downtown Streetscape Experience - 25%, Engineer Workload - 10%, Staff Capabilities - 10%, Proposed Timeframe - 5%. The Statement of Qualifications must not contain any cost information. All proposals shall include a conflict of interest form. Proposals will be evaluated, and at least 2 consultants will be short-listed and considered for this project. As of August 15, 2023, the due date and time has been confirmed with the owner.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects