Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

August 30, 2023

June 30, 2024

1245 NE 3rd St

Renovation

No Information to Display

$745,000.00

Public - City

img_map_placeholder

1245 NE 3rd St, Adair Village, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Sealed bids for the Public Works Buildings 1 & 2 Roof Replacement. Delivered bids must be dropped off inside the Public Works Administrative Office. The work consists of the roof replacements on buildings 1 (one) and 2 (two) at the City of Corvallis, Public Works Department, located at 1245 NE 3rd St, Corvallis, OR 97330. The bidding documents for this project may be downloaded. Questions Due August 14th @ 4pm Work described in this contract and the basis of payment shall include all labor, equipment, and materials necessary to replace the roof on both Building 1 (one) and Building 2 (two) at the Public Works facility located at 1245 NE 3rd St, Corvallis, OR 97330. 1.1.1 Install flute filler foam in flutes of metal roof and install a cover board over flute filler to make a level deck. 1.1.2 Mechanically attach new membrane roof, 60 mil PVC roof system over flute filler and cover board. 1.1.3 Install proper screws and plates for correct fastening depth for wind rating requirements. 1.1.4 Install new pipe boots and pipe jacks as needed. 1.1.5 Install new vents as needed. 1.1.6 Install new drip and rake metal on perimeter of roof. 1.1.7 Heat weld all seams and penetration for securement. 1.1.8 Probe and inspect final roof. 1.1.9 Clean up all gutters, grounds and roof.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.