Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
March 8, 2024
No Information to Display
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - Federal
Multiple Locations, Washington, DC
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Requirements shall be designed in accordance with current industry codes (National Electrical Safety Code, International Building Code, National Electrical Code , California General Order 95, Institute of Electrical and Electronic Engineers, American National Standards Institute, American Society for Testing Materials, etc.), North American Electric Reliability Council Reliability Standards, Federal Energy Regulatory Commission policy, Federal Lands Uniform Act of 1970 procedures, WAPA Construction Standards, WAPA Design Standards Manual, and/or specific project criteria as determined by WAPA. Software used in design and documentation must be: AutoCAD (2020 or newer), Power Line Systems- Computer Aided Design and Drafting (latest version), Microsoft Office (word processing, spreadsheet, database, project, etc.) (Office 365 or newer), and Portable Document File readable by Adobe Acrobat. Some project development activities may be accomplished by WAPA, by other Government agencies, or by other consulting firms. Agency coordination, document and report preparation, management of public meetings, and other public/agency involvement may be required. WAPA sells wholesale energy, generated by 57 hydroelectric plants and one coal-fired plant, to customers such as: Federal and State agencies, Rural Electric Cooperatives, Public Utilities, and Native American Tribes. WAPA operates and maintains over 17,000 miles of transmission lines, over 300 substations and related equipment for a high voltage 69- to 500-kV transmission system.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Washington, DC
Bid Date: Aug 25 2023
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Sep 01 2023
Washington, DC
Bid Date: Aug 30 2023
Washington, DC
Bid Date: Sep 13 2023
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: May 17 2021
Washington, DC
Bid Date: Feb 22 2023
Washington, DC
Bid Date: Aug 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
