Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

October 11, 2023

December 10, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$277,340.00

Public - City

img_map_placeholder

Multiple Locations, West Chester, PA

Subscribe to View Full Documents

The project consists of the installation and panel integration of three (3) electric vehicle charging stations, eight (8) electrical conduits to accommodate future electric vehicle charging stations, sixteen (16) concrete bollards, and the incidental replacement of concrete curb, sidewalk, and asphalt pavement at the West Goshen Township Municipal Complex. Clarification Deadline: 8/23/2023 4:00 PM Each bid must be accompanied by a certified check drawn to the order of West Goshen Township or a Bid Bond in favor of West Goshen Township in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. Please be advised that West Goshen Township enacted Ordinance No. 2-2022 (Chapter 65) for Responsible Contractors on March 15, 2022 The work in connection with this project constitutes Public Work by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project. No bid may be withdrawn within sixty (60) days of the date of the bid opening. West Goshen Township reserves the right to reject any and all bids and to waive any bidding informalities. The Work will be substantially completed within 60 days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 90 days after the date when the Contract Times commence to run.

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects