Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 15, 2023

May 30, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$398,834.00

Public - County

img_map_placeholder

Multiple Locations, Oneill, NE

Subscribe to View Full Documents

The bridge replacement project is a 28-6 wide by 4'-0 long single span bridge with a 25 degree skew Left Hand Back Two-span superstructure replacement 2'-4 wide by 53-3 long over South Fork Elkhorn River, Bridge No. C004519005 The sealed proposals shall include the removal of the existing structure at 494 Avenue and construction of a new bridge and removal of the twin span superstructure at 857 Road and construction of the new superstructure including materials, labor, equipment, tools, along with appurtenances and accessories All proposals for said work must be made on blanks furnished by the County Highway Superintendent and must be accompanied by bid security of not less than 5% of the amount bid. The Holt County Supervisors reserve the right to waive informalities and irregularities and to make awards on bids that furnish the material and construction that will, in their opinion, serve the best interests of Holt County, Nebraska. The Holt County Supervisors also reserve the right to reject any or all bids l Locations: The 857th Road Superstructure Replacement Project crosses the South Fork Elkhorn River and from Chambers, NE travel 1.0 mile east on Hwy 95, travel 3.0 miles North on 488 Avenue, travel 0.2 mile East on 857th Road to the jobsite. Southwest Quarter ofSection 4 Township 26 North Range 12 West The 494th Avenue Bridge Replacement Project crosses an Unnamed Tributary and from Chambers, NE, travel 5.0 miles East on Hwy 95, travel 1.0 mile South on Hwy 281, travel 2.0 miles East on 853rd Road, travel 0.4 mile South on 494th Avenue to the jobsite. Northeast Quarter of Section 32 Township 26 North Range 11 West

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.