Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 5, 2023

December 31, 2023

6100 US-224

Paving, Site Work

No Information to Display

$508,000.00

Public - City

img_map_placeholder

6100 US-224, Findlay, OH

Subscribe to View Full Documents

Prices quoted in Base Proposals shall be guaranteed for a period of sixty (60) days after date of proposal. All requests for information during the bidding period shall be directed to Brett Gies via email at bgies@rcmarchitects.com . Any addenda issued prior to opening of proposals shall be acknowledged on the proposal form. Estimate of Cost General Construction (Including work of all divisions): $521,000.00 Alternate C1 Overflow Parking Lot $190,000.00 Materials purchased for use of consumption in connection with the proposed work will be exempt from the State of Ohio Sales Tax. Bids shall be based on Prevailing Wage Rates of the State of Ohio. Alternate C2 Homestead Pathways $190,000.00 Alternate C3 Great Karg Well Historical Site $160,000.00 To help ensure success, projects need a maintenance and management plan that is flexible and supports site development goals. While native plants tend to germinate and develop at a slower rate than ornamental perennials or turf grass, regular maintenance during the establishment period greatly improves project success. Regular maintenance and monitoring controls invasive species, ensures optimal moisture levels are present, and identifies other necessary management actions Prior to execution of the contract the Contractor shall furnish: A. A Material and Labor Cost Breakdown showing itemized labor and material amounts for the total contract price, Lump sum figures will not be accepted. B. A Declaration of Insurance in compliance with specification requirements. C. A Worker's Compensation Certificate.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.