Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

April 30, 2024

No Information to Display

1500 Northside Dr NW

Paving, Site Work

No Information to Display

$26,000,000.00

Public - City

img_map_placeholder

1500 Northside Dr NW, Atlanta, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Atlanta Beltline (ABI) is soliciting proposals, under a two-step process, from qualified firms to provide Construction Manager at Risk services for the construction of the mainline trail between Trabert Avenue NW Atlanta and Ardmore Park in NW Atlanta. The construction of this segment of trail includes a potential above grade crossing at Northside Drive as well as underpass at Interstate 75. This portion of the trail will have both on grade and elevated sections. The improvements consist of, but is not limited to, the following: o Site demolition and applicable soil haul off as required by drawing specifications o Establishment and maintenance of erosion control per permitted plans throughout the duration of the Project o Grading and construction of stormwater conveyance system per permitted plans o Construction of a multi-use path as outlined in drawings o Lighting and camera installation and subsequent turn over/connection to the Atlanta Police Department (APD) and the City of Atlanta o Construction of the elevated bridges in the causeway at 26th street o Fiber duct bank installation o Landscaping (may be bid separately by Trees ATL) o Site Walls This Project has a DBE goal, which has been set at 30%. Questions Due Date: Aug 15th 2023, 4:00 PM EDT

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.