Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 28, 2023

September 1, 2023

December 30, 2023

811 Constitution Ave

Site Work

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

811 Constitution Ave, Bedford, IN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

NOTICE: THIS SOLCITATION IS RESERVED FOR THE BPA 12445522A0001-0040: Forest Service, Northeast Zone Facilities Construction and Maintenance BPA This project is for the installation of a 2-inch waterline from the proposed water meter located just east of SR 446, running along the north side of Tower Ridge Rd, and over to the new frost-free hydrant within the west end loop of the Blackwell Campground loop road. See Blackwell Waterline Site Map for approximate locations. The waterline can be bored or trenched for a total estimated distance of 2840 feet. A tee and curb valve with box will be installed across from the Brooks Cabin Road entrance. The exact location of the water meter frost-free hydrant, valve and box will be staked by the Forest Service. A tracer line will be installed with the waterline for future location of the line. The depth of the water line will be a minimum of 42 inches. The water meter will be installed by the North Lawrence Water Authority (NLWA). This contract will include the cost of the Tap Fee and NLWA Membership. Period of Performance: 09/01/2023 to 12/30/2023 The magnitude of this construction project is: between $25,000 and $100,000 Question Due Date: 14 August 2023 by 1200 EST *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.