Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 28, 2023

September 27, 2023

July 27, 2024

283 Sylvan Ave

Renovation

No Information to Display

$600,000.00

Public - City

img_map_placeholder

283 Sylvan Ave, Waterbury, CT

Subscribe to View Full Documents

Question Deadline 08/17/2023 at 2:00 PM ET WASHINGTON PARK Pool Facilities Replacement Project The general intent of the Work is: 1. Remove and dispose of the existing pavements, curbing, soil, and lawn. Remove or prune selected trees. Remove and dispose of existing pool, deck, and pump house, and associated infrastructure. Existing Bathhouse shell structure and foundation shall remain. 2. Construct new pool, pumphouse and associated infrastructure. Renovate existing Bath house structure. Remove portion of bath house exterior wall to accommodate new vestibule. 3. Install new concrete pool deck, sidewalks, associated curbing, stairs and ramp with handrails and cheek walls, and bituminous pavement. 4. Install new utility infrastructure including electrical, storm drainage, sanitary, and water. 5. Install new site amenities including stone retaining walls, prefabricated steel picnic pavilion, prefabricated steel and aluminum shade structures, fencing, lighting and benches. 6. Install new landscaping including lawn and trees. 7. Install new irrigation. B. The following outline generally describes the proposed Scope of Work 1. Demolition/site clearing: Remove and dispose of bituminous concrete paving and curbing, fencing, and site amenities. Sawcut road and remove existing bituminous sidewalk and associated curb. Clear and grub trees and vegetation to limits shown. Remove and replace select site utilities including drainage structures, gas, water, and sewer. Protect structures and trees to remain. 2. Earthwork: Cut and fill soil areas associated with pool and pump house construction, sidewalk connections, parking and roadway shoulder area, stairs and retaining walls. Reshape, supplement, and compact existing subbase for bituminous concrete pavement. Reshape and compact subgrade for new curbing and pavements. Reshape, supplement and compact, as necessary turf grass areas and proposed landscape areas. Perform trenching associated with underground site infrastructure. 3. Pumphouse Building: Construct building structure and foundation and all associated infrastructure and finishes. 4. Bathhouse Building: Construct building vestibule addition, install new roof, windows, floor slab, walls, and all associated infrastructure and finishes. 5. Swimming Pool: Construct swimming pool structure including zero depth entry, accessible ramp, stairs and all associated infrastructure and finishes. 6. Pavements: Prepare subbase, base and finished surface for vehicular and pedestrian pavements including bituminous concrete, integrally colorized concrete, specialty pool deck concrete, decorative concrete finishes, concrete stairs and ramp with handrails and cheek walls. 7. Exterior Improvements: Furnish and install new fencing, site amenities, lighting and landscaping.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.