Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 13, 2024

No Information to Display

9 Black Rock Harbor Rd

Addition, Demolition, New Construction, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

9 Black Rock Harbor Rd, Buffalo, NY

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Please note that while workshopping this scope with the Authority and partner consultants in April 2023, critical infrastructure not explicitly called out in the 2014 NFA was identified as in need of repair or replacement. To ensure the integrity of the secondary treatment system and to meet the full intent of the NFA, namely, to treat a flow of up to 400 MGD, those critical "non-NFA" components are included herein. It is the opinion of the Authority that not including those items in these scope and schedule documents would create a false sense for the magnitude and cost of this undertaking. i. Soil Borings and geotechnical soil analysis ii. Outfall 002 Inspection iii. Topographic survey a. Installation of a new 22.5 MGD Final Settling Tank (FST) on the Battery A side: FST 9A i. Includes site dewatering, excavation, deep pile driving and weathertightness testing. ii. Includes connection of new FST 9A to existing Final Control Building and Final Effluent (FE) conduit iii. Depending on findings from Conditions Assessment, may include replacement of gates, control valves, actuators, meters and associated electrical and controls equipment in the existing Final Control Building to ensure new FST 9A operates as intended. The FE conduit on the Battery B side will be evaluated to assess whether a hydraulic Any questions must be received by Roberta L. Gaiek, P.E., Treatment Plant Administrator by Monday, August 14, 2023, 3:00 PM at rgaiek@buffalosewer.org. The Authority reserves the right, in its sole discretion, to amend this Request for Proposals at any time prior to the deadline for submission. The method of contractor has not determined at this time

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.