Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 16, 2023

April 13, 2024

Motley Dr

Paving, Site Work

No Information to Display

$1,833,456.00

Public - City

img_map_placeholder

Motley Dr, Mesquite, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As set forth in the plans and specifications, this project is to rehabilitate Motley Drive from IH-30 to Oates Drive by localized full depth concrete repairs and asphalt mill and overlay. This section of Motley Drive will also receive improvements to pedestrian facilities. Questions due 2:00 p.m., Monday, August 21, 2023 Council Awards Contract :September 18, 2023 (Assumes no bidding irregularities or other issues with the low bidder requiring extensive checking of Qualifications) Notice to Proceed - Start Construction October 16, 2023 (Assumes rapid execution of contract documents by the Contractor with proper insurance and bonds) Substantial Completion :(180 Calendar Day Contract) April 13, 2024 Bidder must submit, with their Bid, a Cashiers check, Certified check or a Bid Bond from an approved surety company, in the amount of five percent (5%) of their Bid as a guarantee that the Bidder will enter into a contract and guarantee forms, if required, within 10 days after notice of award of contract. The successful bidder must furnish both a Performance Bond and a Payment Bond, each in the amount of one hundred percent (100%) of the contract price, from an approved Surety company holding a permit from the State of Texas to act as surety, and acceptable according to the latest list of companies holding Certificates of Authority from the Secretary of the Treasury of the United States, or another Surety acceptable to the City. Further information concerning the procurement may be obtained by email only from the City of Mesquite Engineering Division - Luis Cardoza, P.E., Project Engineer, lcardoza@cityofmesquite.com, assigned City Project Manager. The right is reserved by the City of Mesquite to reject any and all bids.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.