Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 18, 2023

September 20, 2023

October 4, 2023

351 West Dr

Renovation

No Information to Display

$400,000.00

Public - Federal

img_map_placeholder

351 West Dr, Montgomery, AL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

ed due to the underground chill water lines being cut. Existing heating and air conditional units will need to be removed and replaced with energy efficient economic split A/C Heat pumps in the bedrooms and living rooms. Proposed units will require infrastructure modification to walls to accept units. Potential units will require electrical modification of the existing electrical system/panel for them to operate properly. Period of Performance: On or Before 30 September 2023. A site visit is scheduled for the University Inn Buildings 111 and 121, 351 West Dr. Maxwell AFB, AL 36112 on Wednesday, 09 August 2023, at 10:00 AM Central Daylight Time (CDT). Offerors should be at the Maxwell Blvd Gate, Visitor's Center at Maxwell AFB, AL at 9:30 AM CDT to receive a visitor's pass. Please provide a list of all attendees and ensure they have their driver's license, proof of vehicle insurance, and vehicle registration. All attendees' names will need to be submitted by Monday, 07 August 2023, at 4:15 PM CDT. In addition to the attendees name (as reflected on their driver's license), include title and a telephone number for each individual. Submit the requested information to Contract Specialist, Jaeden Alvarez at jaeden.alvarez.2@us.af.mil. Offerors are encouraged to visit the site and take steps as may be reasonably necessary to ascertain the nature and location of work and the general and local conditions that can affect the work or cost thereof. Failure to do so will not relieve offerors from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representation concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in this request for estimates, the specification, or related documents. All pertinent questions shall be submitted by e-mail 15 August 2023 at 11:00 AM CDT. 2.1 Provide eighteen (18) energy efficient economic split A/C Heat pumps. Ductless Mini Split System. Remove old coil units in 18 rooms, old thermostats, all old grills and molding. Repair sheet rock where existing heating and cooling was. Install new mini split units on walls for indoor units. All copper on the outside walls must be cover in line hide. Install new outdoor units, all outdoor units must be placed on 3-inch-thick prefab pads. Must provide on dumpster, remove, and dispose of all old units, grill, and thermostats in each room. Repair wall and ceilings, no painting required.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects