Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

October 23, 2023

July 19, 2024

Multiple Locations

Site Work

No Information to Display

$3,421,897.00

Public - City

img_map_placeholder

Multiple Locations, Hallettsville, TX

Subscribe to View Full Documents

Sheridan 16" Waterline Replacement The Successful Bidder must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond, in accordance with the Instructions to Bidders and the General Conditions. Engineer Estimate: $2,933,055.00 - $3,421,897.50 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Approximately 4,900 linear feet of 16-inch diameter High Density Poly Ethelene (HDPE DR-9) water main; 1,108 linear feet of 8-inch diameter Polyvinyl Chloride (PVC) water main; 58 linear feet of 6-inch diameter Polyvinyl Chloride (PVC) water main; 6 16-inch vertical gate valves with manhole assembly; 3 2-inch air release valves with manhole assemblies; 3 6-inch blow-off valves with manhole assembly; with Trench Safety System; auger boring installation for 30-inch casing and water main in the amount of 521 linear feet to cross under TXDOT and UPRR ROW; open-cut installation of 30-inch casing in the amount of 727 linear feet to cross TXDOT ROW; open-cut installation of 16-inch casing and water main in the amount of 493 linear feet to cross UPRR ROW; installation of 1 2-inch copper service connection and 1 3-inch copper service connection; removal and salvage of 1 existing fire hydrant assembly; install 1 new fire hydrant assembly; removal and replacement of concrete curb, concrete sidewalk, concrete driveway, HMAC pavement, rockwall, park landscaping; Traffic Control Measures within TXDOT ROW and UPRR ROW; Observation and Flagging services by RailPros; protection and support of existing utilities; connection to active water mains and capping old lines; and all miscellaneous piping, fittings, and appurtenances necessary for the proper installation as required in the drawings and technical specifications.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects