Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

January 8, 2024

January 7, 2027

8310 S Dixie Hwy

Renovation

No Information to Display

$2,314,769.00

Public - County

img_map_placeholder

8310 S Dixie Hwy, Miami, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

PROJECT NO.: IRP096 Work under this Contract includes but is not limited to furnishing all supervision, labor, materials, tools, permits, and equipment and performing all operations required for the replacement and improvement of the Public Address Systems on the Metrorail System. The Public Address System shall be integrated with an existing Station Controller Unit (SCU) in each of the Metrorail Stations. All components of the Public Address System shall reside on the Metrorail SCADA Network and be IP Network addressable and remotely configurable over the SCADA Network. All monitoring and reporting shall also occur over the SCADA Ethernet Network. The intent of the work is to obtain the following services at all main-line Metrorail stations: Furnish and install a Public Address System at 22 Metrorail Stations. The Public Address System shall be comprised of the following components: 1.Paging Amplifiers 2.Digital Mixers 3.Surface mounted Station Speakers 4.Interface Digital Mixers with Station Control Units (SCUs) (existing) - manage station paging and Digital Display control. 5.Ambient Noise Sensors. 6.Low Level Audio cabling 7.Provision of power for all components from existing Station UPS. 8.Ethernet Network cabbing between existing Ethernet Switches and equipment provided by the Contractor. Calendar Days for Project Completion: 1095 Anticipated Start Date: 1/8/2024 Performance & Payment Bond Required: YES Bid Bond Required: YES

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.