Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Miramar, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The SOW includes guardrail related work tasks at the City of Miramar. It includes replacement of damaged guardrail sections, posts, beam panels, end anchorages and other guardrail related work. All work tasks include furnishing all labor, materials, equipment, and tools necessary to perform all the work operations in connection with the SOW incorporated in each task work order. Questions regarding this Request for Quotation (RFQu) shall be made in writing to the Procurement Coordinator for this solicitation, Sally Phanor via e-mail at: sphanor@miramarfl.gov. Questions are due by Tuesday, August 1st , 2023, by 4:00pm The City reserves the right to reject any or all quotes, to waive any formalities or minor irregularities in the Solicitation process, and to award or not award a contract based on this solicitation, as deemed in the best interest of the City. General Provisions a) Submittal of a response for this project certifies that all pricing set forth has been arrived at independently, without consultation, communication, collusion, or agreement for the purpose of restricting competition. b) All expenses for complying and submitting quotations to the City are to be borne by the Responder. c) The Work performed by the Responder shall meet all applicable federal, state, and local laws, codes, ordinances, and regulations. d) The Responder shall be responsible for repairing, at no expense to the City, any damages that occur from the performance of the Work. e) The Successful Responder must have no conflict of interest with the City regarding any other work performed by the Successful Responder The scope of work includes guardrail related work tasks within the City of Miramar. These work tasks include replacement of damaged guardrail sections, posts, beam panels, end anchorages and other guardrail related work. All work tasks include furnishing all labor, materials, equipment, and tools necessary to perform all the work operations in connection with the Scope of Work incorporated in each task work order.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.