Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 29, 2023

November 28, 2023

11311 Santa Ana Rd

Paving, Site Work

No Information to Display

$300,000.00

Public - County

img_map_placeholder

11311 Santa Ana Rd, Ventura, CA

Subscribe to View Full Documents

The District is soliciting sealed bids for Lake Casitas Recreation Area Paving, Questions may be directed to Corban Suggs, csuggs@casitaswater.com All requests for information and questions regarding this bid proposal, the specifications, permits, or the plans shall be submitted to the District. The request can be emailed to Corban Suggs, csuggs@casitaswater.com. The District will make a reasonable attempt to respond to the request prior to the bid opening. All questions shall be submitted via email by 4:00 p.m. on Tuesday, August 15, 2023. If questions are received after that time they will not be answered General Description. Casitas Municipal Water District (District) is soliciting bids for paving Lake Casitas Recreation Area Paving. The work location is contained within the 11311 Santa Ana Road, Ventura, CA 93001 in Ventura County, CA as shown in the Contract Documents. Work includes: 2.1 Mobilize and demobilize materials and equipment to project site. 2.2 Grind 2-inch thick asphalt concrete and overlay 3-inch thick, 1/2 -inch aggregate asphalt concrete on main road. 2.3 Install 3-inch speed hump with 1/2 -inch aggregate asphalt concrete on main roadway. (Optional bid item) Pulverized asphalt may be placed on property adjacent to the work site. 3. General Sequence of the Work. 3.1. Contractor shall notify the District of planned start date and general plan or order of work to be completed. A pre-construction meeting shall be held by the District for contract work. A field visit shall be conducted with District staff to field verify the scope of contract work including installation, removal, and abandonment. 3.2. The Contractor shall notify the District at least 10 days prior to any road shutdown. 3.3. District Inspector will verify all work is completed in a manner consistent with the governing agency standards and will verify measurement of work. 3.4. Contractor submits a monthly progress payment request.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.