Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

September 15, 2023

September 14, 2024

101 Pivers Island Rd

Site Work

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

101 Pivers Island Rd, Beaufort, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The National Oceanic and Atmospheric Administration, National Ocean Service, National Centers for Coastal Ocean Science, Beaufort Laboratory, Beaufort, NC, has a requirement for fabrication/installation of ADA hand railing on two separate docks and one building and fabricate two scuba tank storage cages located at NOAA Beaufort Laboratory, 101 Pivers Island Road, Beaufort, NC 28516 in accordance with the attached Statement of Work. Period of Performance September 15, 2023 through September 14, 2024. See solicitation and supporting documents for further details. ***100% Small Business Set-Aside*** Businesses. The estimated magnitude of this project is between $25,000.00 and $100,000. Question Deadline Aug 23, 2023 at 11:00 AM All questions must be submitted in writing to tamico.little@noaa.gov. Telephone inquiries will not be honored. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project has the following major components. Removed all current railing from building stairs, ramps, and walkways Fabricate and install approximately 40' Aluminum 1-1/2" pipe, brushed, sch 40. ADA 3-line safety rails on Dock #1. Use type 316 stainless steel hardware to attach all railings to dock. Use 410 stainless steel concrete anchoring screws where railing will be attached to dock. Fabricate and install approximately 57' Aluminum 1-1/2" pipe, brushed, sch 40. ADA 3-line safety rails on Dock #2. Use type 316 stainless steel hardware to attach all railings to dock. Use 410 stainless steel concrete anchoring screws where railing will be attached to dock. Fabricate and install approximately 150' Aluminum 1-1/2" pipe, brushed, sch 40. ADA 3-line safety rails on designated building. One section of railing will be removable. Use type 316 stainless steel hardware to attach all railings to building. Use 410 stainless steel concrete anchoring screws where railing will be attached to building. Fabricate two 5' x 3' scuba tank storage cages with aluminum materials. Material for cages to include angle, grate plate, pipe, and pads. Fabricate both cages to exact specification as originals.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects