Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 11, 2023

September 11, 2023

January 9, 2024

3899 Orders Rd

Renovation, Site Work

No Information to Display

$222,000.00

Public - City

img_map_placeholder

3899 Orders Rd, Grove City, OH

Subscribe to View Full Documents

Work shall generally include: spot preparation of the interior dry coating system and a full application of an overcoat on the interior dry surfaces excluding the bottom of the bowl, an abrasive blast preparation and full coating of the exterior bottom of the bowl, two spot coating repairs in the interior wet and modification of the tank drain line. The subject tank is a 1.25 MG steel-fluted column elevated water storage tank. Interior Dry (Excluding the bottom of the bowl): Spot power tool cleaning of failed coatings will be completed, a primer shall be applied to the spot prepared areas and the entirety of the interior dry surface shall then receive a single overcoat. This work shall only occur above the condensate ceiling level. Interior Dry - Bottom of the bowl: Abrasive blast cleaning to SSPC-SP6; 1.0 mil angular profile and application of a primer and finish coat for the entirety of the bowl exterior. Interior Wet - Localized repair of two failed areas through power tool preparation and spot coatings. Tank Drain Line Modification: Replacement of the existing 2" mud/drain valve with a 4" drain valve and replacement of the connecting drain pipe with a 3" pipe. The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The work shall be completed within one hundred twenty (120) calendar days from the City's issuance of the Notice to Proceed for the Contract . This project requires payment of prevailing wages to all workers during the course of construction activities. Bidders must comply with the prevailing wage rates on public improvements in Franklin County and the City of Grove City, Ohio as determined by the Ohio Bureau of Labor & Worker Safety, Wage and Hour Division, 614-644-2239. State of Ohio prevailing wage rates are included in the Contract Documents and prospective bidders shall take them into account in preparing bids. The City of Grove City, Ohio, reserves the right to reject any and all bids, to waive technical defects as the interest of the City may require; and, to conduct such investigation as necessary to determine the lowest and best bidder for the Contract.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects