Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 23, 2024

August 23, 2029

Fulkerson Dr

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Fulkerson Dr, Jerseyville, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Complexity Factor for this project is 0.035. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for US Route 67 from Fulkerson Drive to Crystal Lake Road in Jersey County. Currently, US Route 67 has been identified for pavement replacement in accordance with the Departments Transportation Asset Management Plan (TAMP). The proposed improvement is to replace the existing pavement while staying within the footprint of the existing roadway, where possible. This improvement may involve drainage, ADA, and minor intersection improvements. Public involvement will be required, as well as environmental studies. This work will involve all work necessary for the preparation of the Project Report, including but not limited to, environmental studies and coordination, Location Drainage Study, geometric studies, public involvement using Context Sensitive Solutions, Intersection Design Studies (IDS), traffic management plan, pickup surveys, and all other work necessary to complete Phase I and obtain Design Approval. Phase II engineering services required for this project are anticipated to include the preparation of all Plans, Specifications and Estimates (PS&E documents). This includes roadway plans, maintenance of traffic plans, culvert plans, drainage plans, storm water pollution prevention plan, erosion control plans, and traffic signal plans. Additional items include, but are not limited to, supplemental surveys, pavement design, geotechnical borings/cores and analysis, and all other necessary related work to complete Phase II for final PSE. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project The method of contractor selection has not been determined at this time. IDOT - 036 - RFQ Engineering - US Route 67 from Fulkerson Drive to Crystal Lake Road, Phase I/II Project

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects