Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Collinsville, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0.035.. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Phase I work, if required, may consist of conducting route surveys, geotechnical analyses, hydraulic survey/analysis, geometric studies, and reviews, preparing Bridge Condition Reports, Hydraulic Reports, Structure Geotechnical Reports, Type, Size and Location (TS&L) plans, Intersection Design Studies (IDSs), Value Engineering studies, Right of Way information, and Project Reports (Categorical Exclusion projects only). This work may include data collection, cost estimates, traffic management analysis, crash analysis, development of alternative alignments, preparing environmental and hazardous waste documents, infrared testing of bridge decks, and all other related work required to produce the necessary Phase I documents and reports. This work could include amending or updating existing Project Reports. Projects may include public involvement. Public involvement may include coordinating and leading stakeholder meetings, public informational meetings, and public hearings, preparing exhibits for meetings and hearings, Context Sensitive Solutions (CSS) duties and evaluating and incorporating comments from those meetings into a report. The Phase II work, if required, may consist of conducting route surveys, land surveys, hydraulic analyses, geometric studies, structure plans, roadway plans, and any other related work required to complete plans, specifications, and estimates as necessary. The various proposed projects may consist of ADA improvement plans, simple roadway patching and resurfacing, bridge repair, bridge rehabilitation, bridge replacement, roadway widening and resurfacing and/or new roadway projects. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: The method of contractor selection has not been determined at this time. IDOT - 035 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects