Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Collinsville, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase I/II surveying services are required for various projects and assignments, in District Eight. The Consultants work is anticipated to consist of, though not limited to, performing survey services for the Land Acquisition Section, in District Eight. This may include surveying to reference the highway centerline to public land lines, land surveying to locate boundaries, record research, preparation and recording of monument records, preparation of legal descriptions, preparation of Freeway Orders, preparation of various plats and maps including Plat of Highways, existing right of way survey plats or maps, centerline plats, corridor protection maps and excess parcel plats. The Consultants work may include right of way staking and designing proposed right of way for acquisition. The work performed shall comply with the Departments Land Acquisition Manual and with District Eights standards, guidelines, and procedures. The Consultants work may also include performing land surveying services to assist the District Eight Plats and Plans Unit. This may include work as a District Eight - Land Survey Project Manager, which would consist of the management and review of right of way survey projects as prepared by other Consultants for the department. The Consultants work may also include providing other field and office technical support services. The District Eight - Land Survey Project Manager and office technical support staff may require work at the District office or remotely, based on District Eights needs. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Surveying) category to be considered for this project. The method of contractor selection has not been determined at this time. IDOT - 034 - RFQ - Various Phase I/II Surveying Project

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects