Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

September 25, 2023

May 1, 2024

Multiple Locations

Renovation

No Information to Display

$752,115.00

Public - City

img_map_placeholder

Multiple Locations, West Vancouver, BC

Subscribe to View Full Documents

Tenders are invited for the proposed Electrical Upgrades at three (3) District of West Vancouver water distribution pump stations: Vinson Creek pump station, 1559 Vinson Creek Road; Burnside Pump Station, 1374 Burnside Road and; Cross Creek Pump Station, 955 Cross Creek Road. All Sites: Supply and installation of metering kiosk, kiosk pad, and 1 meter stub-off - Note: BCH is responsible for all civil works up to the 1 meter kiosk stub-off Supply and installation of new equipment and wiring as shown on RFP drawings Relocation, reuse, and wiring of existing equipment where applicable Pre-commissioning of new and existing equipment via portable generator is required in advance of the voltage cutover Voltage conversion cutover commissioning Decommissioning and disposal of all existing DWV equipment that is no longer in use following the voltage conversion Burnside Pump Station - 1374 Burnside Road Existing Voltage - 480V New Voltage - 600V Backup Generator and fuel to be supplied by DWV Pump station downtime - maximum 12 hours Cross Creek Pump Station - 955 Cross Creek Road Existing Voltage - 480V New Voltage - 600V Backup Generator and fuel to be supplied by Contractor Pump station downtime - maximum 12 hours (seasonal; downtime may be longer depending on water supply and demand) Vinson Creek Pump Station - 1559 Vinson Creek Road No change in station voltage - 600V Backup Generator and fuel to be supplied by DWV Pump station downtime - maximum 12 hours

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.