Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2023

September 18, 2023

September 30, 2024

To Be Determined

New Construction, Site Work

No Information to Display

$300,000.00

Public - Federal

img_map_placeholder

To Be Determined, Pine Ridge, SD

Subscribe to View Full Documents

Bid Package #6B - Modular Housing Submit RFI's by to Jake Losett at jlosett@scullconst.com. CONTRACT DESCRIPTION: The work of each separate prime contract is identified in the bid scopes. Scope of Project Scull Construction and the Oglala Lakota County School District are seeking proposals for the design, construction, delivering, and setting services for 10 each three-bedroom modular housing units for the Oglala Lakota Wolf Creek Staff Modular Housing - Phase 2 project. Drawings and performance specifications are available for use for putting together the bid/pricing component of this RFP. If you are interested in this project, please respond to all questions below. The project is tentatively scheduled to break ground fall of 2023 with a required completion date of September 2024. This completion date isforthe entire project and modular houses will need to be delivered per the schedule issued with the Construction Manager's Bid Manual The scope of this RFP will consist of providing modular housing units to meet the plans, specifications, and bid package issued with this project. Construction services to provide all trade labor, material, management, and CMAR support to provide a complete system scope of work for the following: o Construction of 10 each three-bedroom modular housing units: o To meet the intent shown in the plans/specifications/bid package issued with this project (Base Bid): Including all dimensions to match what is shown on the plans o Contractors will have an option to provide Value Engineering pricing to provide modular housing units thatstill meet all of the performance criteria in the plans/specifications, but that allow for dimensions that are more standard for their manufacturing capabilities o Transportation/delivery of units to the project site (by the dates shown in the project schedule) o Setting of the modular housing units on the site foundations: o All foundations that the units will be setting on will have full basements o Modular contractors to include provisions for stair access into the basements o The intent is for the modular housing supplier to provide and install all materials as called out in the plans/specification/bid package; the Owner is trying to eliminate on-site work as much as possible: o The modular supplier is to include all mechanical, electrical, and plumbing systems complete (on-site tie-ins will be by others): All modular unit equipment will need to be run off of electricity o The only things that are intended to be done on-site (by others), after the units have been set as a part of the scope of work of this package is: Tying in of modular unit into foundation Building of decks/ramps Tying in of electrical service into house panel Tying of water/sewer services Buildout of basements

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.