Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Dixon, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0.035. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 25, 2023, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase I and/or II engineering services are required for various projects throughout District Two. The Phase I work, if required, may consist of conducting route surveys, land surveys, hydraulic surveys, hydraulic analyses, geometric studies, and preparing Project Reports (Categorical Exclusion projects only). This work may include data collection, development of alignment alternatives, cost estimates, ADA, traffic management analysis, crash analyses, Type, Size and Location (TS&L) drawings, structure plans, and other related work and exhibits necessary to produce the Project Report. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest including resumes of the key people noted above must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 20 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects