Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

December 14, 2026

Interstate 80

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Interstate 80, Seatonville, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase III engineering services are required to provide Reconstruction of I-80 mainline pavement from west of Joliet Junction Trail to west of Wheeler Avenue, Work included, but is not limited to, continuously reinforced PCC pavement with PCC shoulders, reconstruction of the I-80 Eastbound Bridge over Joliet Junction Trail, the I-80 Westbound Bridge over Joliet Junction Trail, I-80 Eastbound Bridge over Midland Avenue and the I-80 Westbound Bridge over Midland Avenue, drainage system improvements, signing, lighting, traffic signals, ITS improvements, noise abatement walls and all other work necessary to complete the improvement in accordance with the approved plans and specifications. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 11 - RFQ - I-80 from W of Joliet Junction Trail to Wheeler Ave & at Joliet Junction Trail (Abandoned RR), Phase III Project

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.