Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

November 17, 2025

I-94

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

I-94, Chicago, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 2, 2023, at 11:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide replacement of the deteriorated structure carrying Oakton Street over I-94 (Edens Expressway). Work includes, but not limited to, bridge reconstructed to accommodate a future widening of I-94 and increased vertical clearance raised to 16'5". Pedestrian and bicycle accommodations will be provided across the replacement structure along Oakton Street. Resurfacing will also include the intersection East of the bridge with HMA. The existing traffic signals at Oakton Street/Gross Point Road/Central Avenue will be upgraded along with the addition of an eastbound right turn lane. The underpass lighting will be upgraded to LED lighting. There is existing intersection lighting at Oakton Street/Gross Point Road that will be replaced with combo traffic signal poles. Also, the stairs near Niles West High School will be reconstructed and several PACE bus pads will be constructed within the project limits. Any and all incidental work to complete the improvement. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 07 - RFQ - I-94 at Oakton St (Overhead), Phase III Project

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.