Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Schaumburg, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0. This project requires 20% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 27, 2023, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required to provide and to complete preparation of plans, specifications and estimates for roadway lighting and electrical engineering projects at locations throughout District One. The plan preparation may require traffic management plan, utility coordination, and ComEd electric services. Work may be a combination of new and/or upgrading and modernizing existing equipment to current IES, NEC, AASHTO, FHWA, FAA, IDOT District One standards, and other duties as assigned. If required, Environmental work such as filling out the Environmental Survey Request, fill out wetland impact evaluation forms, calculate excavation volumes, provide ESR Exhibits showing project limits, providing HARGIS maps and other maps of the project limits, providing shape files, etc. may be included. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Special Plans (Lighting: Complex) Special Services (Electrical Engineering) The Environmental Reports (Environmental Assessment) prequalification category requirement may be completed by the Sub and/or Prime Consultant. The environmental work must be performed using staff that has been presented in your most recently approved Statement of Experience and Financial Condition. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 04 - RFQ - Various Phase II Projects, Various Routes, Various Counties

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.