Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 22, 2024

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Mount Pleasant, MI

Our team is requesting plans for this project.

Subscribe to View Full Documents

Reference Number 0000326787 Mill Pond Park Weir & Pedestrian Bridge Repairs and Chipp-a-waters Park Riverbank Restoration - Professional Engineering Services The City of Mt. Pleasant is seeking proposals for the design of the Mill Pond Park Weir & Pedestrian Bridge Repairs and Chipp-A-Waters Park Riverbank Restora-tion Project. The Mill Pond Park Weir & Pedestrian Bridge (43.6021, -84.7839) is a cast-in-place concrete weir structure maintaining a difference in up-stream/downstream water levels of approximately 4 feet (a parallel branch of the river runs through a series of rock dam weirs). The substructure consists of con-crete abutments at the east and west ends of the structure, two intermediate concrete piers and concrete wingwalls in the southwest and southeast quadrants. The substructure supports a cast-in-place concrete deck span carrying the non-motorized trail with timber railings mounted to either side of the deck. The City recently obtained an evaluation of the structure that recommended the following: In-depth evaluation of the concrete spillway structure. Removal of woody debris from the upstream ends of the piers. Patching, crack repair and waterproofing of the substructure units. Epoxy overlay of the concrete deck. Replacement of timber railings. Tree removal and clearing around the footprint of the structure. Slope stabilization. Asphalt trail repairs (anticipating damage during construction). Question Acceptance Deadline 08/18/2023 12:00 AM EDT Questions are submitted online Yes The City of Mt. Pleasant reserves the right to accept or reject any or all bids, to waive any irregularities in the bids, and to select the bid considered most advantageous to the city.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects