Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

April 19, 2024

March 28, 2024

Highway 62B and Highway 412

Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Highway 62B and Highway 412, Cotter, AR

Subscribe to View Full Documents

"As of October 19, 2023, bids received were rejected as they were over the budget. No definite date for the rebid." Site Directions: Project is located in Cotter, Arkansas on Arkansas Highway 412 approximately 0.75 miles east of the intersection of Hwy 62B and Hwy 412 Each sealed envelope containing a BID must be plainly marked on the outside as BID for: Booster Pump Station at Highway 412 Water Distribution System Pressure Stabilization and the envelope should bear on the outside the Bidders name, address, and license number if applicable, and the name of the project for which the BID is submitted. If forwarded by mail, the sealed envelope containing the BID must be enclosed in another envelope addressed to the OWNER at: City of Cotter 115 McLean Avenue Cotter, Arkansas 72626 Information for Bidders, Bid Forms, Form of Contract, Plans and Specifications, Bid Bond Form, Performance and Payment Bond Forms, and other Contract Documents may be examined at the following locations: Engineering Services, Inc., 1207 S. Old Missouri Road, Springdale, Arkansas 72765, and City of Cotter, Arkansas, 115 McClean Avenue, Arkansas 72626. The project consists of the following: Installing a quadplex booster pump skid and building with controls and piping, Installing an emergency power generator, Installing approximately 50 feet of 8-inch water main, Connections to existing water mains, and All appurtenances necessary for a complete installation, as specified and shown on the Plans.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.