Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

No Information to Display

9 Mann Memorial Dr

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

9 Mann Memorial Dr, Cromwell, CT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The work consists of electrical equipment procurement, temporary electrical service and site preparation at Cromwell Middle School, 6 Captain James Mann Memorial Drive, Cromwell CT 06146. The work will be separately contracted per the bid packages below: (bid package scopes of work are located in the Specifications). This Project will be awarded to the lowest responsible bidder including slected alternatives. The Construction Manager and Owner reserve the right to reject any and all bids, or any part of any bid, waive any informalities, irregularities, omissions or technical defects in the bids when it is determined to be in the best interest of the Owner or Construction Manager. All proposals should be addressed to Newfield Construction in a sealed envelope. Project name, bidder's name and address and the bid package number should be written on the envelope. No oral, telephone, or telegraphic proposals will be considered. All bids shall stand available for acceptance for a period of ninety (90) days from the date bids are opened. No bidder may withdraw their bid during this period. All bidders must comply with all provisions of Connecticut General Statutes 31-53 (Prevailing Wages) and Executive Order #3. This project is being performed under a Construction Manager/Contractor agreement. Newfield Construction is the Construction Manager. Review and include all terms of the Newfield's Trade Contract Agreement located in the Bid Documents.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.