Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

No Information to Display

200 Granby St

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

200 Granby St, Norfolk, VA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This amendment extends the response date and time to 24 August 2023 at 2:00PM EST. Amendment Two to the Combined Synopsis/Solicitation is attached. the changes thereto are in red font. This is to attach the Combined Synopsis/Solicitation that has become unavailable, This amendment corrected the POC in Attachment III Past Performance Questionnaire. Attachment III is replaced herein. This amendment edits Paragraph 4.5.8.2 of the Performance Work Statement (PWS) and an amended PWS is provided herein. Additionally vendor Q&A's are attached. This Administrative Amendment added four attachments for Wage Determinations. Dial Telephone, Public Address (PA), and General Alarm (GA) System for the NOAA FSV Class ships. Contractor shall be responsible for a complete ABS approved design, procurement and fabrication of all materials, installation, subcontractor oversight, drawings, testing, and creation of all drawing and technical manuals. Installation includes procurement and installation of all equipment, cables, banding, cable tags, removal of old system, installation of all new mounts and equipment, testing and inspections. Installation shall be accomplished on all four (4) vessels. Removal and Installation requirements are contained this Performance Work Statement. The Combined Synopsis/Solicitation, References and attachments ate provided herein.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.