Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 18, 2023

August 16, 2024

320 Fielden Ave

Addition, Demolition, Renovation, Site Work

No Information to Display

$2,000,000.00

Public - State/Provincial

img_map_placeholder

320 Fielden Ave, Port Colborne, ON

Subscribe to View Full Documents

The Work is to include a 3 stop elevator, 2 stop vertical lift, washroom upgrades and universal washroom. Addition or renovation having an area of approximately 28m2 (3025 sq. ft) all in accordance with the Contract Documents. Mechanical, Electrical, Paving, Roofing and Data Cabling Subcontractors are PREQUALIFIED as well. The completion schedule is such that the Owner requires the Contractor achieve Substantial Performance of the Work no later than July 24, 2024 and to achieve Total Completion no later than August 16, 2024. Take over procedures are to follow the process outlined in OGCA 100 - OAA/OGCA Takeover Procedures (2007).

49 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.