Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

October 2, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Pinedale, WY

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The work consists of approximately 5 miles of road reconstruction; including milling the existing asphalt, culvert replacements, placement of 71,000 CY of Pitrun, 41,500 TN of Crushed Base a 22,100 TN of Asphalt and miscellaneous appurtenances. CONTRACTORS shall be required to accompany each bid with a BID Bond with sufficient surety, or a certified check, cashiers check or bank draft upon some reputable bank payable to Sublette County for at least ten (10) percent of the total amount of the BID. The bond, check or bank draft shall be forfeited as liquidated damages, if the CONTRACTOR, upon the letting of the contract to him, fails to enter into the contract within ten (10) days after it is presented to him for that purpose or fails to proceed with the performance of the contract. The BID Bond, draft or check shall be retained by Sublette County until proper bond to secure performance of the contract has been filed and approved. All the above is to be in accordance with 15-1-113 and 16-6-101 to 121, Wyoming Statutes, 2023. The right is reserved by Sublette County to reject any and all BIDS, and to waive any irregularity or informality in the BID process. BIDS may not be withdrawn for thirty days after the date of opening.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.