Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

October 27, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Big Rock, IL

Subscribe to View Full Documents

Site Directions: This roadway pavement rehabilitation consists of three project locations for a total length of approximately 1.11 miles. The first roadway rehabilitation area is along Wheeler Road between Welch Creek and Dauberman Road. The second project area is along Jefferson Avenue from Fourth Street to Second Street. The third project location is along Rhodes Street from Price Road to U.S. Route 30. This roadway pavement rehabilitation consists of three project locations for a total length of approximately 1.11 miles. The first roadway rehabilitation area is along Wheeler Road between Welch Creek and Dauberman Road. The second project area is along Jefferson Avenue from Fourth Street to Second Street. The third project location is along Rhodes Street from Price Road to U.S. Route 30. Along Wheeler Road, the existing HMA pavement will be fully removed, the existing aggregate base will be partially removed and prepped by others, and a new 2.25" binder and 1.5" surface course will be constructed. Also along Wheeler Road, a 2-ft aggregate dressed shoulders will be constructed by others. At the Jefferson Avenue location, crumbling sections of HMA pavement along the outer edges of roadway will be sawcut and fully removed. These sections will receive proposed aggregate base course repair and HMA pavement patches at a 4' width. At locations of pavement removal and patching, a 2-ft aggregate dressed shoulders will be constructed. Along Rhodes Street, the existing HMA pavement will be milled at a 2.25" depth and repaved with a 0.75" leveling binder and 1.5" of surface course. A quantity of pavement patching has been included for locations identified by the engineer following milling operations. At all three locations, work will also include landscape restoration of any disturbed areas, pavement markings applied to the final surface, traffic control and protection, as well as all incidental and collateral work necessary to complete the improvements described herein.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.