August 17, 2023
September 18, 2023
October 27, 2023
Multiple Locations
Paving, Site Work
No Information to Display
$500,000.00
Public - City
Multiple Locations, Big Rock, IL
Site Directions: This roadway pavement rehabilitation consists of three project locations for a total length of approximately 1.11 miles. The first roadway rehabilitation area is along Wheeler Road between Welch Creek and Dauberman Road. The second project area is along Jefferson Avenue from Fourth Street to Second Street. The third project location is along Rhodes Street from Price Road to U.S. Route 30. This roadway pavement rehabilitation consists of three project locations for a total length of approximately 1.11 miles. The first roadway rehabilitation area is along Wheeler Road between Welch Creek and Dauberman Road. The second project area is along Jefferson Avenue from Fourth Street to Second Street. The third project location is along Rhodes Street from Price Road to U.S. Route 30. Along Wheeler Road, the existing HMA pavement will be fully removed, the existing aggregate base will be partially removed and prepped by others, and a new 2.25" binder and 1.5" surface course will be constructed. Also along Wheeler Road, a 2-ft aggregate dressed shoulders will be constructed by others. At the Jefferson Avenue location, crumbling sections of HMA pavement along the outer edges of roadway will be sawcut and fully removed. These sections will receive proposed aggregate base course repair and HMA pavement patches at a 4' width. At locations of pavement removal and patching, a 2-ft aggregate dressed shoulders will be constructed. Along Rhodes Street, the existing HMA pavement will be milled at a 2.25" depth and repaved with a 0.75" leveling binder and 1.5" of surface course. A quantity of pavement patching has been included for locations identified by the engineer following milling operations. At all three locations, work will also include landscape restoration of any disturbed areas, pavement markings applied to the final surface, traffic control and protection, as well as all incidental and collateral work necessary to complete the improvements described herein.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Big Rock, IL
--
Sycamore, IL
Bid Date: Sep 06 2023
Wilmington, IL
Bid Date: Sep 08 2023
Northlake, IL
Bid Date: Jul 12 2023
Springfield, IL
Bid Date: Sep 22 2023
Paxton, IL
Bid Date: Sep 22 2023
Toledo, IL
Bid Date: Sep 22 2023
Mount Vernon, IL
Bid Date: Sep 13 2023
Chicago, IL
--
Chicago, IL
Bid Date: Jun 18 2021
Nashville, IL
Bid Date: Sep 22 2023
Milan, IL
Bid Date: Sep 22 2023
Lincoln, IL
Bid Date: Sep 12 2023
Gurnee, IL
Bid Date: Sep 01 2023
Clinton, IL
Bid Date: Jul 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.