Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 19, 2024

No Information to Display

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Atlanta, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The actual scope of services could vary from the tasks listed above and communicated to eligible firm(s) prior to actual agreement. The Owner will provide additional details and a list of general duties required in Commissioning Services for this Project to eligible finalists. Include any projects where scope of services has included building envelope commissioning. Describe innovations that the firm might have introduced or employed to increase the project's adherence to technical standards. It is noted that the services of the Design Professional or Construction Professional and various subcontractors are NOT provided for under this Scope of Work and the CxA is not responsible for providing their services. The Training Center is projected to be 80,000-100,000 GSF, and the maximum building capacity is currently projected to be 500. The Training Center will include classrooms, technical labs, high-capacity spaces suitable to contain manufacturing scale training simulations incorporating robotics, mechatronics, welding, motors, and other advanced manufacturing technologies. There will be a critical demand for hardwired and wireless networking capabilities, multiple segmented and secured server spaces, and A/V installations. Designated training spaces will also need appropriate utilities, air-handling and safety/emergency response capabilities related to high-voltage components, "thermal runaways" and potential toxic chemical release. The Center will require robust safety, security, fire suppression and emergency response systems. Candidate teams will demonstrate competency and experience in sustainable, healthy-building construction strategies. The delivery method for this Project will be construction manager at-risk (CM/GC), and, at a minimum, will employ the services of a Design Professional and a Commissioning Agent, in addition to the services of a CM/GC

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.