Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

October 23, 2023

December 4, 2023

Sierra Ave

Site Work

No Information to Display

$1,069,918.00

Public - City

img_map_placeholder

Sierra Ave, Clovis, CA

Subscribe to View Full Documents

Liquidated Damages $1,000 per Calendar Day Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration Thirty (30) Working Days This project involves +-0.6-mile of street rehabilitation on Sierra Avenue from Willow Avenue to Peach Avenue including pulverizing in place the full depth of AC pavement, replacement of concrete curb returns, adjustments of utility boxes, manholes, and utility valve boxes to finish grade, replacements of traffic striping, markings and signage, traffic signal modification, and reinstallation of traffic loop detectors. Pre-Bid Meeting No

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.