Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

December 24, 2023

Multiple Locations

Demolition, Site Work

No Information to Display

$188,000.00

Public - City

img_map_placeholder

Multiple Locations, Rushville, IN

Subscribe to View Full Documents

Company & Contacts HWC Engineering Question Deadline 08/18/2023 at 5:00 PM ET All requests for clarification should be made in writing to: Attn: Dustin Whalen HWC Engineering dwhalen@hwcengineering.com Lisa Brewer, lbrewer@hwcengineering.com 8122342551 Demolition of the building(s) located at 337 W 4th Street, Rushville, IN 46173. The site generally contains an abandoned grain elevator facility with grain elevator building, unloading pit, storage tanks, storage building, and foundations. The contractor shall be responsible for hiring an Indiana Licensed Asbestos Inspector to conduct an asbestos inspection of the facilities to be demolished. Any required asbestos abatement as a result of the inspection will be addressed via change order. The Contractor shall demolish and dispose of the existing building(s). Contractor shall take precautions as shown on the plans and specifications to protect the adjacent buildings, roads, sidewalks, etc. Dust control shall be accomplished using continuous wetting as described in the specifications. All demolition debris shall be removed from the site and disposed of in accordance with the specifications, as well as all state and federal regulations. The foundations and slabs shall be removed to at least 24i below grade, with any voids backfilled with granular material as shown on the plans. Any utilities encountered below grade during demolition activities shall be capped at the most exterior point of the excavation for demolition

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects